Manage resource scheduling and planning. Solutions::Schedule is designed to provide Windows Developers with an enhanced drag and drop resource scheduling user interface for their applications. The package includes sample applications (complete with Visual Basic source code) that illustrate the use and interactivity of the component in a working application. Like all DBI COM components, Solutions::Schedule adheres to Microsoft’s OLE standards allowing perfect implementation in Web applications and ASP.NET solutions, maintaining the rich user interface and full drag and drop capabilities we have come to depend on.
特征综述 About Feature
声明:本产品中文介绍为慧都控件网版权所有,未经慧都公司书面许可,严禁拷贝、转载!
The ctSchedule object is a full-featured scheduling system control. ctSchedule allows you to quickly add employee or resource scheduling to your applications. This ActiveX component gives you the ability to print schedules, assign time lines or bars to a resource, change the viewing granularity (zoom in and zoom out), and create a wide variety of time bar styles.
The ctSchedule control contains the following sections:
- Title: The title section contains the titles for the list column. The Title section can contain up to 100 columns
- Ruler: The ruler section is to the right of the Title section and is the same height as the Title section. It contains the time data used to make up the schedule
- List: The list section resides under the Title section. It contains the list of all items. (ie. employees, resources, etc. ) The list can contain up to 32,000 items and up to 100 columns
- Schedule: The schedule section contains the time bars or schedules for each item. Each item can have up to 32,000 time bars
更新时间:2008-2-25 | 录入时间:2006-4-12 | 编辑:liuzh | 审核:lianjl